Project 05 · Bharatpur
Damauli-bharatpur220kV Transmission Line
← Back to All Projects
Project Overview
Complete route planning, tower spotting, foundation design and conductor stringing across challenging terrain.
Key deliverables
- —Topographic survey across 72 km of ridge and valley.
- —Tower foundation design with local material adaptation.
- —Stringing and sagging with live-line safety protocols.
Technical Specifications
StatusComplete
District / LocationBharatpur
Timeline12 months from survey mobilization to commissioning.
OutcomeImproved line reliability, reduced corridor risk, and optimized tower placement for steep slopes.
ClientNepal Electricity Authority