BHUMLU Logo
BHUMLUConstruction

Project 04 · Dang

Ghorahi-khungri Madichaur 132kV Transmission Line

← Back to All Projects

Project Overview

Detailed route alignment, topographic survey, tower spot checks, foundation design reviews and conductor stringing planning for a 132kV line across remote terrain.

Key deliverables

  • Topographic survey across 72 km of ridge and valley.
  • Tower foundation design with local material adaptation.
  • Stringing and sagging with live-line safety protocols.

Technical Specifications

StatusComplete
District / LocationDang
Timeline12 months from survey mobilization to commissioning.
OutcomeA fully commissioned transmission route with safer tower placement, optimized corridor alignment and reliable delivery for the Dang region.
ClientKEC international Ltd

Need a similar line surveyed?

Consult with our engineering team for terrain assessment and preliminary scoping.

Consult Now