MCC

← Back to All Projects

Project Overview

Complete route planning, tower spotting, foundation design and conductor stringing across challenging terrain.

Key deliverables

  • Topographic survey across 72 km of ridge and valley.
  • Tower foundation design with local material adaptation.
  • Stringing and sagging with live-line safety protocols.

Technical Specifications

StatusIn-process
District / LocationNuwakot-Chitwan
Timeline12 months from survey mobilization to commissioning.
OutcomeImproved line reliability, reduced corridor risk, and optimized tower placement for steep slopes.
ClientNepal Electricity Authority